We Our Hometown News Search
Our Newspaper AdsHG413Submit NewsPlace Classifieds
the reminder, we are hometown news

Shingle Offset Manchester CT

How well three-tab shingles hold up over time depends to some degree on the patterns used to lay them. Although many customers prefer to see the cutouts aligned on the roof, this directs runoff into channels that erode the shingle surface in Manchester.

Rl Sanborn Masonry Inc.
(207) 479-7567
256 Bancroft
Portland, ME
J.F.C. Endeavors
860-793-6805
Hartford, CT
Nordic Builders of Tolland, LLC
860-871-9055
Hartford, CT
Carrier Home Builders, Inc.
860-747-2517
Hartford, CT
Carrier Enterprises, Inc.
860-793-9626
Hartford, CT
The ReCONNstruction Center
8605973390
230 South Street
New Britain, CT
David Stoner and Co., LLC
860-679-5254
Hartford, CT
New Ground, LLC
860-428-2954
Hartford, CT
Jeffrey G. Michelson Custom Homes, LLC
860-217-0900
Hartford, CT
Tom Falik Properties, LLC
860-729-7245
Hartford, CT
Data Provided by:
  
Provided By:

Shingle Offset

Source: REPLACEMENT CONTRACTOR Magazine
Publication date: October 1, 2004

By REPLACEMENT CONTRACTOR Staff

How well three-tab shingles hold up over time depends to some degree on the patterns used to lay them. Although many customers prefer to see the cutouts aligned on the roof, this directs runoff into channels that erode the shingle surface.

There are four basic patterns to laying out three-tab shingles: straight-up method (A), half-pattern (B), 4-inch offset (C), and 5-inch offset (D). The 5-inch offset pattern provides the best all-around protection. —Excerpted from JLC Field Guide to Residential Construction, published by JLC Books (JLConline.com), a division of Hanley Wood, LLC.

A. STRAIGHT-UP METHOD

The straight-up method of laying shingles offsets alternating courses 6 inches from a vertical line up the roof (half a tab width for metric shingles). The alignment of butt joints and cutouts in every other course, however, can cause premature weathering of surface granules.

B. HALF-PATTERN

A half-pattern (also called half-tab or sixes) staggers each course with a 6-inch offset (half a tab width for metric shingles). Butt joints are better protected from water migrating horizontally, but cutouts still align every other course.

C. 4-INCH OFFSET

A 4-inch offset keeps cutouts separated by two courses, and butt joints align every 10 courses.

Click here to read full article from Replacement Contractor

Reminder Publications, Inc. 280 North Main St., East Longmeadow, MA 01028 • Ph 413.525.6661 • fax 413.525.5882
Archives Search Advertiser Info Contact Us Home